Our process

Our Bathroom Remodeling Process in the Greater Detroit Area — Simple, Clean & On Schedule

From your first call to the final walkthrough, here’s exactly what to expect when you work with your local Romulus-based bathroom remodeler.

Get My Free Estimate (734) 775-9076

What you’re looking atThe result of our process. An old tub (left) becomes a seamless luxury acrylic shower (right), the most common project we complete in two days.

Before and after: an old bathtub converted into a luxury acrylic shower in 2 days, tub-to-shower conversion in Metro Detroit
1

Call or Request Your Free Estimate

Call (734) 775-9076 or send the form. Tell us what you’re dreaming of — a safer tub, a new shower, a full remodel — and we’ll find a time that works, including evenings and weekends.

2

Free On-Site, No-Obligation Estimate

We visit your Romulus-area or Detroit-area home, measure the space, check plumbing and discuss styles, colors and features. For walk-in tubs we also measure doorways, floors and your water heater.

3

Your Written, Itemized Price

You’ll receive a clear proposal that lists materials, labor and timeline. No pressure — take as long as you need to decide.

4

Choose Finishes & Schedule

Pick your luxury acrylic wall finish, base, fixtures, door style and options. We order your custom-fit materials and lock in install days.

5

Expert Installation

Floors and hallways are protected, the old tub or shower comes out, and your new system goes in. Luxury acrylic showers are typically finished in two days; full remodels take 1–2 weeks.

6

Final Walkthrough & Cleanup

We clean up thoroughly, walk you through every feature, and answer care questions so your new bathroom looks great for years.

2-day install

What a 2-Day Luxury Acrylic Shower Installation Looks Like

Luxury acrylic shower installations and tub-to-shower conversions are our fastest projects. The schedule at right shows the two days at a glance, and you can see every wall finish on our luxury acrylic showers page.

Day 1: Out with the old

We protect your floors, remove the old tub or shower, inspect the plumbing and framing, and prepare the walls for your new system.

Day 2: In with the new

Your custom-fit base and wall panels go in, fixtures and glass are installed, seams are sealed and everything is tested and cleaned.

How to prepare

  • Clear towels and décor from the bathroom
  • Let us know where to park the work vehicle
  • Plan on a short water shut-off while plumbing is connected
What you’re looking atYour 2-day installation scheduleDay 1 (left) is demolition and preparation. Day 2 (right) is installation, sealing, testing and cleanup, with a final walkthrough.
Two day luxury acrylic shower installation schedule: day one demolition and prep, day two installation, sealing and cleanup
Full remodels

How Long Does a Full Bathroom Remodel Take?

A complete bathroom remodel typically takes one to two weeks. Smaller hall bathrooms finish closer to one week, while primary bathrooms with new layouts and custom tile take the full two. Your written proposal lists the exact schedule before you decide.

  • Demolition and plumbing rough-in come first
  • Waterproofing and tile follow
  • Vanity, fixtures and lighting go in next
  • Paint, trim and your final walkthrough finish the job

Not sure which project fits your home? Compare every option on our bathroom remodeling services page.

What you’re looking atA typical 1–2 week remodel timelineEach blue bar is a phase of the remodel, laid across Week 1 and Week 2. The moving line shows how the schedule progresses from demolition to walkthrough.
Bathroom remodel timeline chart showing a typical one to two week bathroom remodeling schedule in Metro Detroit
Easy payment

Straightforward Payment Options

We accept cash, debit, credit and checks.

Cash
Debit
Credit
Checks
Process questions

Frequently Asked Questions About Our Bathroom Remodeling Process

How long will my bathroom be out of service?

A tub or shower replacement is typically back in service in 1–2 days. A full bathroom remodel runs one to two weeks depending on the scope of work.

Do I need to be home during installation?

Someone 18 or older should be available on the first morning and for the final walkthrough. In between, we work tidily and keep you updated.

How do payments work?

We accept cash, debit cards, credit cards and checks. Your written proposal explains exactly when each payment is due.

What if you find something unexpected behind the walls?

Older Michigan homes sometimes hide surprises. If we find something, we stop, show you, and review options and costs with you in writing before continuing.

What happens during the free on-site estimate?

We visit your home, measure the space, look at plumbing and walls, and talk through styles and features. There is no pressure and no obligation. Request your free estimate.

How should I prepare for installation day?

Clear towels and décor from the bathroom, let us know where to park and plan for a short water shut-off while plumbing is connected. For options and finishes before install day, see our services page.

Ready for a Bathroom You Love? Let’s Talk.

Free on-site, no-obligation estimates anywhere within 40 miles of Romulus. Call, or send the quick form — a real local person answers.

Call (734) 775-9076Free Estimate